PROJECT DESIGN
You can choose one of our pre-designed models or if you wish we can design a custom project tailored to your needs. If you want us to design your project, our Architecture and Engineering department teams are available to develop the project of your dreams.2
BUILDING PERMITS & GROWTH CONTRACT
Green Magic Homes will provide the construction plans for license approval. We also provide the engineering documents, fire resistance testing, structural testing, and all the other documentation needed to procure local permits. Once the documentation is approved you can proceed with the construction of the unit. This is also the time to define the final look of the unit since the a growth contract must be established with a local grower so that the vegetation cover is ready once the project is completed.3
FOUNDATION
First the foundation area is excavated to the desired depth. The footings are then poured, while the area under the slab and around the footings is filled with gravel for drainage purposes. Plumbing lines are roughed in as well as any drains for sump pumps. Next any applicable insulation and a vapor barrier is placed over the gravel. Then the foundation is poured.4
SHELL ASSEMBLY
The panels are adhered and fastened together then anchored to the slab until the unit is assembled. A professional crew of 3 can assemble around 70 meters per day depending on the complexity of the layout.5
PERIMETER DRAINAGES
Once the foundation is set, a perimeter excavation must be made around the slab to construct a drainage system that ensures evacuation of rainwater from around the structure.6
ELECTRICAL INSTALLATIONS AND AIR CONDITIONING
Once the foundation is completed, all wiring and electrical systems are installed into the shell along with all the systems for the ductless HVAC units.7
WATERPROOFING
First, all the perforations, joints and all points are carefully sealed, so that a perfect and lasting insulation is achieved. Then flanges of the entire structure is waterproofed to guarantee an optimal and long-lasting result. All access points including electrical boxes, HVAC entry points, VRF ducts, etc. are also waterproofed.8
INSULATION
Once the structure is sealed, insulation is applied to the back of the structure. The type and thickness of the insulation varies according to the local climate and we use different combinations to attain the desired R Value. Our technology is adaptable to all climates, from the extreme heat of the desert and tropical climates to perpetual snow and extreme cold conditions.9
INSTANT BUTTRESS
Our patented laser-cut system that frames the bermed slope is assembled around the unit. Then the cells are filled with cellular concrete or a sand-cement mix - whichever is best suited for the project.10
INTERIOR BUILDOUT, DOORS & WINDOWS
Once the assembly of the structure has been completed, the framing and buildout of the interior can take place. At the same time, the internal joints between the FRP panels are filled and finished to give the shell interior a seamless look. Once the interior layout is completed the shell and internal walls can be primed for painting. At the same time windows and doors are installed, and fixtures are set. Next, the electrician installs switches, receptacles, light fixtures, and electrical appliances, such as the oven and range. The HVAC systems are also wired and installed.11
COVERING WITH EARTH AND OUTDOOR GARDENS
As the interior is finished, the exterior slope is created with a mortar core using our proprietary system. The mortar is covered by top soil and some form of soil retention and an erosion control system. The formulations vary depending on the location, type of soil, vegetation, etc. There are situations were a drip irrigation system is also installed. Once the slopes are set, the vegetation can be planted so that the final result, once covered with grass and decorative gardens, is absolutely impeccable and you have as a result a beautiful green home.12
INTERIOR FINISHES AND DECORATION
The final interior finishing stage includes doors, moldings, cabinets, countertops, and shelves are installed at this time. This includes kitchen cabinets, bath cabinets, bathroom sink bases and medicine cabinets, all other built-in cabinets such as bookcases, fixtures and internal trims. The house is now ready for decoration that will give the final touch of beauty that emphasizes the magic that our green technology offers.13
FINAL INSPECTIONS AND YOUR GREEN MAGIC HOME IS FINISHED
After the unit is complete, all final inspections from the county or city for building, electrical, mechanical, and plumbing take place. Once the unit is in full compliance and has been approved, the municipality will issue an occupancy permit and the home is now ready to move into.
Finally you will have a Green Magic Home full with bright vaulted spaces, lush green gardens, and natural be